Routing and loading
Operations sequenced across machines with capacity visible, so the plan resembles the floor.
Planning, batches and traceability in one run
By week, last eight weeks
QC decisions pending
| Item | Stage |
|---|---|
| BT-4412 · QC hold | Hold |
| BT-4409 · retest | Hold |
| BT-4415 · release | Approval |
| BT-4401 · released | Done |
| BT-4398 · released | Done |
Interface illustration, drawn with this site’s own design tokens. Sample figures, not a running system.
What actually happens on the floor: routing, machine loading, operator output and wastage, captured at the station rather than written up at the end of the shift.
This is one of our own products, not a client build. Ask us what it does today before you plan around it — we will tell you what is running and what is not.
These are the sections of the system, and they are the same ones shown in the interface above — the page and the screen are generated from one description, so they cannot disagree.
Not every area is needed by every operation. Which ones apply, and which need writing rather than configuring, is what the discovery conversation is for. How we deliver →
Operations sequenced across machines with capacity visible, so the plan resembles the floor.
Production and rejection entered where the work happens, which is what keeps the number current.
Stoppage reasons and scrap recorded, so recurring causes become countable instead of anecdotal.
Typically a plant or workshop where the daily sheet is still filled in by hand.
In most cases, a shift diary, a stock register and a monthly reconciliation — and the person whose job has quietly become moving figures between the two.
We do not publish a feature matrix or a saving figure for this product. Ask us what it does today, and what it does not, before you plan around it.
Every engagement starts the same way whichever product is involved: written scope before any code, an explicit out-of-scope list, documented handover, and IP transferred to you on final payment. How we deliver →
Tell us the process you are trying to fix and we will say whether Kaizen Production is the right starting point — including when it is not.