BOM and work order
Multi-level bills, work orders raised against demand, and material issued specifically to the order.
Work orders, output and downtime against one plan
By week, last eight weeks
Largest gap first
| Item | Stage |
|---|---|
| WO-1182 · line 2 | Behind |
| WO-1176 · line 1 | Behind |
| WO-1190 · setup | Approval |
| WO-1171 · closed | Done |
| WO-1168 · closed | Done |
Interface illustration, drawn with this site’s own design tokens. Sample figures, not a running system.
Bill of materials, work orders, job work and costing, so the cost of a finished item is built from what was actually consumed rather than a standard rate applied afterwards.
This is one of our own products, not a client build. Ask us what it does today before you plan around it — we will tell you what is running and what is not.
These are the sections of the system, and they are the same ones shown in the interface above — the page and the screen are generated from one description, so they cannot disagree.
Not every area is needed by every operation. Which ones apply, and which need writing rather than configuring, is what the discovery conversation is for. How we deliver →
Multi-level bills, work orders raised against demand, and material issued specifically to the order.
Material sent out, processed and received back, tracked with the challan and the loss recorded at each stage.
Material, labour and overhead accumulated per process, giving a cost per unit you can defend in a meeting.
Typically a plant or workshop where the daily sheet is still filled in by hand.
In most cases, a shift diary, a stock register and a monthly reconciliation — and the person whose job has quietly become moving figures between the two.
We do not publish a feature matrix or a saving figure for this product. Ask us what it does today, and what it does not, before you plan around it.
Every engagement starts the same way whichever product is involved: written scope before any code, an explicit out-of-scope list, documented handover, and IP transferred to you on final payment. How we deliver →
Tell us the process you are trying to fix and we will say whether Kaizen Manufacturing is the right starting point — including when it is not.