Estimate against actual
Budgeted quantity and rate compared with what has been consumed, per activity and per site.
Work, materials and billing against the same BOQ
By week, last eight weeks
Blocking work first
| Item | Stage |
|---|---|
| Indent · cement | Approval |
| Indent · steel | Approval |
| RA bill · 7 | Review |
| Indent · sand | Cleared |
| RA bill · 6 | Cleared |
Interface illustration, drawn with this site’s own design tokens. Sample figures, not a running system.
Site-level costing and progress billing, with labour, material and subcontractor cost reconciled against the estimate while the work is still going on.
This is one of our own products, not a client build. Ask us what it does today before you plan around it — we will tell you what is running and what is not.
These are the sections of the system, and they are the same ones shown in the interface above — the page and the screen are generated from one description, so they cannot disagree.
Not every area is needed by every operation. Which ones apply, and which need writing rather than configuring, is what the discovery conversation is for. How we deliver →
Budgeted quantity and rate compared with what has been consumed, per activity and per site.
Measurement books, certified quantities and running account bills raised from the same measurements.
Indent, issue and return at site, and labour deployment by contractor with attendance.
Typically an owner or builder tracking units, leases or site work in parallel files.
In most cases, one sheet per property and a separate collections list — and the person whose job has quietly become moving figures between the two.
We do not publish a feature matrix or a saving figure for this product. Ask us what it does today, and what it does not, before you plan around it.
Every engagement starts the same way whichever product is involved: written scope before any code, an explicit out-of-scope list, documented handover, and IP transferred to you on final payment. How we deliver →
Tell us the process you are trying to fix and we will say whether Kaizen Construction is the right starting point — including when it is not.